Business Overview

清洁能源供货商

Photovoltaic Power

In line with the industrial policy and sustainable development strategy of China, and to explore clean energy sector apart from the natural gas business of the Group, superstructure construction of distributed photovoltaic power generating units (the “Photovoltaic Project”) at the top of the existing plant buildings has been gradually carried out by the Group with aims to provide the existing plants of the Group and power grids with new high-quality clean energy through the generation of photovoltaic power, and to open up new sources of income and room for business growth for the Group.

The Group takes Jing-Xing Power Plant as the first pilot site for the Photovoltaic Project with planned construction capacity of approximately 500kW (which represents approximately 0.11% of the existing equity installed capacity of the Group). The Photovoltaic Project is being constructed in two phases, and the first phase had been commenced in January 2018 with a construction capacity of approximately 217kW and an investment cost of approximately RMB1.6 million. The Group expects that approximately 60% of the power to be generated will be used for the daily operation of Jing-Xing Power Plant, while the rest will be sold to the power grid. On 28 March 2018, the first phase of the Photovoltaic Project in Jing-Xing Power Plant has completed and successfully connected to the power grid and put into operation.

In April 2018, Anji Power Plant commenced construction of its Photovoltaic Project with a total construction capacity of approximately 361kW (which represents approximately 0.079% of the existing equity installed capacity of the Group) and a project investment of approximately RMB2.4 milllion. On 13 June 2018, the Photovoltaic Porject in Anji Power Plant has completed and successfully connected to the power grid and put into production.